paving project
before paving
construction staking
designed cross section
existing grade elevations
proposed grades

BRIEF DESCRIPTION

Asphalt removal & replacement 98,866 Square Feet
Concrete pads replacement
Concrete curb installation 850 LF

AT A GLANCE

Project Type Asphalt replacement & concrete installation
Client Stag Industrial
Completion Date Fall 2019
Project Size 98,886 Square Feet

Stag Industrial Trucking Terminal
2207 S 114th St.
West Allis, WI

This was a trucking terminal project involved an extensive amount of planning before construction that included recording existing elevations and redesigning to improve drainage. A concrete curb was installed along the eastern edge in order to collect the water and direct it to existing catch basins.