Asphalt removal & replacement 98,866 Square Feet
Concrete pads replacement
Concrete curb installation 850 LF
Asphalt removal & replacement 98,866 Square Feet
Concrete pads replacement
Concrete curb installation 850 LF
| Project Type | Asphalt replacement & concrete installation | 
| Client | Stag Industrial | 
| Completion Date | Fall 2019 | 
| Project Size | 98,886 Square Feet | 
Stag Industrial Trucking Terminal
2207 S 114th St.
West Allis, WI
This was a trucking terminal project involved an extensive amount of planning before construction that included recording existing elevations and redesigning to improve drainage. A concrete curb was installed along the eastern edge in order to collect the water and direct it to existing catch basins.