Nathan Hale High School Parking Lot
Before parking lot
pulverize parking lot
Grading at parking lot
concrete at nathan hale
Paving at Nathan Hale

BRIEF DESCRIPTION

This was a complete parking lot reconstruction project which included pulverizing all existing asphalt, excavating areas to stabilize, adding drain tile, replacing catch basins, and installing new concrete curb. This is the quintessential turn-key project in which we performed all facets of the project. We are proud to use this as an example of our vast capabilities.

AT A GLANCE

Project Type Parking Lot Reconstruction
Client Nathan Hale High School West Allis
Completion Date 2020
Parking Lot Size 195,137 Square Feet of asphalt
Concrete Curb 2,187 LF
Drain Tile 2,427LF
Replacement Catch Basins 3