BRIEF DESCRIPTION

This project included a complete reconstruction of the center parking lot at Goodwill Industries’ Talentbridge location in Greendale, WI. Specifications required the entire asphalt and stone cross section to be removed due to instability. Then, drian tile was installed in order to aide in groundwater drainage. Once drainage was achieved by grading the existing sub grade, a full cross section of stone and asphalt was installed.

AT A GLANCE

Project Type Full Depth Parking Lot Reconstruction
Client Goodwill Industries
Completion Date 2015
Project Size 61,600 Square Feet

SCOPE OF WORK

Goodwill Industries
5400 S 60th St.
Greendale, WI
Goodwill Industries

Excavate 14″
Install 1,825 L.F. of 4″ perforated drain tile
Install soil stabilization fabric
6″ of Breaker Run
6″ of 1 1/4″ traffic bond
2.5″ Binder and 1.5″ Surface