BRIEF DESCRIPTION

Completed in 2015, this project represents a true Turn Key Solution that Suburban Asphalt can offer. This was a complete site reconstruction which included challenges in engineering and coordination. All facets of our operation were at work here including, site grading, erosion control, concrete flatwork & curb and gutter, stone work, asphalt paving, and striping.

AT A GLANCE

Project Type Church
Sacred Heart Monastery 7335 S Lovers lane rd., Franklin, WI
Completion Date 2015

SCOPE OF WORK

Sacred Heart Monastery
7335 S Lovers Lane rd.
Franklin, WI

Excavated approx. 4,000 C.Y. of material
Installed approx. 3,500 tons of stone base
Installed 10-12 catch basins
Paved over 2,000 tons of asphalt
Poured over 2,500 L.F. of concrete curb & gutter