WE ARE PROUD TO SUPPORT

    • October

      11

      2017
    • 80
    • 0
    Muskego Center

    Muskego Center

    The parking lot at one of the main shopping centers in the Village of Muskego was recently paved. This was a 4″ removal and replacement project measuring 39,367 square feet. Visitors and tenants alike can enjoy a freshly paved parking lot with crisp yellow lines!

    • June

      29

      2017
    • 96
    • 0
    West Brook Shopping Center

    West Brook Shopping Center

    This project was a large scale asphalt mill and overlay in Waukesha. The existing surface was removed while the lower layer was allowed to remain. A new layer was paved and new pavement markings were painted. What a great project!

    • September

      9

      2015
    • 1349
    • 0
    Sacred Heart Monastery

    Sacred Heart Monastery

    Completed in 2015, this project represents a true Turn Key Solution that Suburban Asphalt can offer. This was a complete site reconstruction which included challenges in engineering and coordination. All facets of our operation were at work here including, site grading, erosion control, concrete flatwork & curb and gutter, stone work, asphalt paving, and striping.

    • August

      20

      2015
    • 707
    • 0
    The DoubleTree Hotel

    The DoubleTree Hotel

    The DoubleTree Hotel in Brookfield, WI received a face lift with this beautiful project. The entire front entrance and a majority of their concrete sidewalk was removed and replaced. in addition, 74,000 Square Feet received sealcoating, crack filling, and striping. What a beautiful result!

© Copyright 2017 Suburban Asphalt Co., Inc.